Friday, May 28, 2010

The Knitting Hour


Finally, after weeks of working on my lace tee, it's done. I guess you can say that when I am deterimined to finish something, I find a way. This time, I resorted to staying up until almost 3:00 this morning to do it.

I made some changes to the pattern as written in the June 2010 Knit 'n Style. The first major change was using a DK weight yarn, Rowan Purelife. I loved the color when I saw it (on sale - woohoo!) last year at my FLYS. I really like the slight color variegations in the yarn. It is also organic cotton - perfect for the summer and knits a lot softer than I expected. As expected, it doesn't hide the imperfections (e.g. the changes in tension when I decreased along the raglan shaping and the fake seam stitches). I think that washing and blocking the garment may help with these issues.

The second change was using the waist shaping from the Cap Sleeve Top in the August 2010 Knit 'n Style issue. Believe me, I need all the shaping that I can get. It makes the garment much more flattering.

A third change I made was crocheting 4 rows of SC and slip stitches, instead of just 2, because the neckline didn't look even to me. Plus, I started finishing the top at the upper corner of the front neckline...and cut the yarn in the same place. Needless to say, it didn't look too pretty, so I crocheted the extra rows to hide my oops. It was really late, what can I say?